| 1. HEADQUARTERS WURTH HELLAS SA |
The building covers an area of about 4.700 m2 and its roof consists of curved steel trusses.
The design is fully accomplished and the construction of the building is finished.
Cost (revised): 6.900.000 €
Employer: WURTH HELLAS SA
Year of design: 1989
Architects: TH. BOBOTIS
|
| 2. SPORTS HALL IN CRETE |
The main stadium has dimensions 56x67m and is surrounded by the amphitheater and the recreation hall. One half of it is covered by curved steel trusses, and the other half has curved wooden beams, both seating on a central, box-like main steel truss.
The support of the wooden beams to the main truss is materialized through horizontal springs , so that temperature effects will be eliminated , and also for the wooden beams to remain under constant prestress , mainly for deflection reasons
The design is fully accomplished and the construction of the building is completed.
Cost (revised): 5.500.000 €
Owner: POLYTECHNIC SCHOOL ( TEI ) OF CRETE
Contractor: ROMVOS SA
Year of design :1998
Architects: TH. BOBOTIS AND ASSOCIATES Ltd
|
| 3. AIR CARGO TERMINAL OF “OLYMPIC AIRWAYS “ IN THE NEW ATHENS AIRPORT |
Storage building of about 17.500 m2 consisting of large span steel beams. Design for competition biding purposes (“Design – Construction” system), which received the top mark of the competition.
Cost (revised): 15.900.000 €
Owner: OLYMPIC AIRWAYS
Employer: J/V «PSICTIKI ELADOS SA –ΤΕRΝΑ SA»
Year of design: 1999
Architects: K. KYRIAKIDES AND ASSOCIATES SA
|
| 4. MUNICIPALITY STADIUM IN CHANIA |
Stadium extending over a total area of about 10.150 m2 ,with the main hall having dimensions 47Χ40m, covered by steel roof.
The latter consists of space trusses seating on an inside box-like truss girder of dimensions 2.4x3.0m. Design for competition biding purposes (“Design – Construction” system).
Cost (revised):3.800.000 €
Owner: MINISTRY OF CULTURE – ATHLETICS BRANCH( ΓΓΑ)
Contractor: KTISTOR SA
Year of design: 2000
Architects: ARCHITEKTONIKI SA – P. Gramatopoulos – Ch. Panousakis
|
| 5. GYM HALL OF ARSAKION SCHOOL IN THESSALONIKI |
Gym hall with capacity for 350 persons, having dimensions 32.5 Χ 35.5 m, covered by steel roof. The design is fully accomplished and the construction of the building is completed.
Cost (revised): 1.500.000 €
Employer: ARSAKION SCHOOLS FOUNDATION
Year of design: 2000
Architects: J. LEONTOPOULOS
|
| 6. MAIN PRESS CENTER FOR THE ATHENS 2004 OLYMPIC GAMES ( MPC) |
7 storey building with 3 basements covering a total area of about 35.000m2 , consisting of large span composite steel beams .
In order to achieve large spans with low height of beams, they are hanged by rigid trusses situated at the top floor. Design for competition biding purposes (“Design – Construction” system)
Cost (revised):56.000.000 €
Owner: MINISTRY OF CULTURE–ATHLETICS BRANCH( ΓΓΑ)
Employer: J/V «GEK SA – ATHINA SA»
Year of design: 2001
Architects: D & L POTIROPOULOS
|
| 7. MEDICAL HEALTH CENTER IN CHALANDRI/ ATHENS |
Addition of 3 floors on top of existing ground floor, using steel elements. For the support of the new steel columns of the upper floors, a mechanical floor just above the existing ground floor is used, consisting of trusses throughout its depth. The design is fully accomplished and the construction of the building is completed.
Cost (revised): 2.100.000 €
Employer: MAGNETIC TOMOGRAPHY SA
Year of design:1992
Architects: D. KATAROPOULOS
|
| 8. CENTER OF EUROPEAN DEVELOPMENT FOR PROFESSIONAL EDUCATION (CEDEFOP) |
4 storey building with basement covering a total area of about 9.500 m2 . Design for competition biding purposes (“Design – Construction” system)
Cost (revised): 4.200.000 €
Owner: HELLENIC EMPLOYMENT ORGANIZATION
Contractor: J/V «ΑΤΕΝΕ - TH. KARAGIANES SA»
Year of design: 1996
Architects: TH. BOBOTIS and ASSOCIATES Ltd
|
| 9. RESTORATION OF AN EXISTING INDUSTRIAL BUILDING TO BE USED AS CULTURAL CENTER |
In the location of an old gas storage steel building, a new circular steel building is designed, consisting of a concrete basement, on the perimeter walls of which sit the new steel columns of the upper floors.
The upper structure has the shape of dodecagon with columns and diagonal bracing members parallel to the existing ones, which are not demolished.
The design is fully accomplished as part of a successful competition biding (“Design –Construction “system) and the construction of the building is completed.
Cost (revised):1.300.000 €
Owner: MUNICIPALITY OF ATHENS
Employer: J. CHARBILAS
Year of design: 1998
Architects: MEAS Ltd
|
| 10. PRIVATE HOUSE IN VOULA /SOUTHERN ATHENS SUBURBS |
Building with 2 floors of about 1.050m2, with large cantilevers is made by steel composite structure. Design and construction completed
Cost (revised): 1.200.000 €
Employer: ANDREAS ANDREADIS
Designed : 2006
Architects: SPACELAB ARCHITECTURE
|
| 11. PRIVATE HOUSE IN FILOTHEI/ NORTHERN ATHENS SUBURBS |
3 floor building with basement of about 900m2.
The upper floor is divided from the rest of the building for architectural reasons and therefore a steel composite structure is used. Design and construction completed
Cost (revised): 1.100.000 €
Εmployer: SOTIROPOULOS THAN.
Designed: 2001
Αrchitects: ZE GE Ltd
|
| 12. PRIVATE HOUSE IN PSIHICO, NORTHERN ATHENS SUBURBS |
2 floor building with 2 basements of about 760m2.
For the large spans requirements “Vierendel” type steel frames are used. Design and construction completed.
Cost (revised): 850.000 €
Εmployer: P.PAPADATOS
Designed: 2007
Αrchitects: SPACELAB ARCHITECTURE
|
| 13. SHIPPING COMPANY’S HEADQUARTERS
“ALL SEAS” IN VOULA
|
3 floor building with 2 basements of about 4.800m2, with large cantilevers is made by steel composite structure.
Design and construction completed
Cost (revised): 6.400.000 €
Εmployer: ALL SEAS SA
Design: 2006
Αrchitects: Κ. KYRIAKIDES AND ASSOCIATES S.A.
|
| 14. PRIVATE HOUSE IN FILOTHEI |
3 floor building with 2 basements of about 1.100m2.
The upper floors with large spans is made by steel composite structure.. The design is completed
Cost (revised): 1.300.000 €
Εmployer: ΟTHON KOLLIRIOTIS –EVA KAPNIDOU
Designed: 2007
Αrchitects: INGRID FRANGADONI
|
| 15. SUPER MARKET “LIDL HELLAS” in AEGINA |
Super market of about 1.600m2 with steel trusses 41m over 5.5m.
The design is completed and construction works are in progress.
Cost (revised): 1.500.000 €
Εmployer: LIDL HELLAS Ltd
Designed: 2010
Αrchitects: M. MARIOLOPOULOU
|
| 16. SUPER MARKET “METRO” IN TRIKALA |
Building with dimensions 52Χ40m and 15Χ 30m with steel trusses 40m over 5.6m. Design and construction completed
Cost (revised): 1.800.000 €
Εmployer: ΜΕΤΡΟ SA
Designed: 2001
|
| 17. 6 HANGARS FOR 14 TANKS ON THE ISLAND OF LESBOS 98 ADTE |
Hangars 24Χ39 m, consisting of one span frames of 24m length, over 5.5m.
The design is fully accomplished and the construction of the building is completed.
The design is adopted by the Owner and has been repeated several times.
Cost (revised): 3.000.000 € (6 hangars)
Owner: MINISTRY OF DEFENCE- ARMY GENERAL STAFF
Contractor: DOKAT SA
Year of design: 1996
|
| 18. HANGAR FOR TANKS IN 311 ΕΜΑ |
Hangars 42Χ34 m, consisting of one span frames of 34.0 m length, over 6.0 m.
The design is fully accomplished, and the construction of the building is completed.
Cost (revised):3.500.000 €
Owner: MINISTRY OF DEFENCE- ARMY GENERAL STAFF
Contractor: PROTAGORAS SA
Year of design: 2003
|
| 19. WORKSHOP 3rd – 4th DIVISION Ε/Π CH- 47C AT S 307 ΤΣΥΑΥ |
Workshop 49 Χ 70 m, consisting of two bay spans of 24.5m each, over 5.0m, seating on reinforced concrete elements.
The design is fully accomplished and the construction of the building is completed.
Cost (revised): 1.700.000 €
Owner: MINISTRY OF DEFENCE- ARMY GENERAL STAFF
Contractor: J/V «VΑΣΚΟ SA – POLITECHNIKI SA»
Year of design: 1999
|
| 20. HANGARS ΕΕ/Π ΑΗ –64A FOR APACHEES AT 1st ΤΕΕΠ Α/Δ STEFANOVIKI, N. GREECE |
Hangars 103.5Χ22.5 m, consisting of 6 major parts of 17.2Χ22.5 m. each, without inside columns, used as parking lot of 6 APACHE helicopters.
The design is fully accomplished and the construction of the building is completed.
Cost (revised):6.000.000 €
Owner: MINISTRY OF DEFENCE- ARMY GENERAL STAFF
Contractor: PIXITIS SA
Year of design: 2004
|
| 21. SPORTS CENTRE IN AG.PARASKEVI/ N.ATTICA |
The design is fully accomplished as part of a successful competition biding (“Design –Construction» system).
The construction of the building is completed.
Cost (revised):600.000 €
Employer: MUNICIPALITY OF AG. PARASKEVI
Year of design: 1987
Architects: J. MOUZAKIS
|
| 22. SPORTS CENTRE OF POLYTECHNIC SCHOOL IN KOZANI |
The design is fully accomplished as part of a successful competition biding (“Design–Construction” system) .
The construction of the building is completed.
Cost (revised): 800.000 €
Employer: POLYTECHNIC SCHOOL OF KOZANI
Year of design: 1998
|
| 23. PRIVATE BASKETBALL COURT IN MAROUSI |
Private basketball court of about 1.500m2. The design is completed
Cost (revised): 1.600.000 €
Εmployer: PAN. ANGELOPOULOS
Designed: 2006
Αrchitects: ΜΕΑΣ SA
|
| 24. INDUSTRIAL BUILDING IN MARKOPOULO - ATTICA |
The design is fully accomplished and the construction of the building is completed.
Cost (revised): 900.000 €
Owner: FRANKE HELLAS
Contractor: ERGOKAT SA
Year of design: 1995
|
| 25. ADDITION OF TOP (6TH )FLOOR TO EXISTING BUILDING OF THE GENERAL ARMY HEADQUARTERS |
Addition of one floor made of steel elements covering an area of 150 m2, on top of a 5 storey building.
The framing system consists of rigid floor girders seating on chosen positions of the existing reinforced concrete framing system, whereas the columns and the roof beams are made of light steel sections.
The design is fully accomplished and the construction of the building is completed.
Cost (revised): 500.000 €
Owner: GENERAL ARMY HEADQUARTERS (ΓΕΕΘΑ )
Employer: ALKI SA
Year of design: 1997
|